Workforce drivers: How do you enter driver impacts when the project is in HC and FTE?
When creating a project with both HC and FTE using the workforce drivers, by default:
the option to correlate impact in FTE with impact in HC is activated for each driver rule
The HC mode will govern the FTE mode (you only need to assess the impacts in the HC mode)
The same +/- variation will be applied in both mode (+2 HC means +2 FTEs)
To change these settings, go to Project settings > General settings and scroll down to the Workforce needs section.